Nysret Musliu

AI
h-index24
11papers
18citations
Novelty41%
AI Score49

11 Papers

AIDec 18, 2022
Answer-Set Programming for Lexicographical Makespan Optimisation in Parallel Machine Scheduling

Thomas Eiter, Tobias Geibinger, Nysret Musliu et al.

We deal with a challenging scheduling problem on parallel machines with sequence-dependent setup times and release dates from a real-world application of semiconductor work-shop production. There, jobs can only be processed by dedicated machines, thus few machines can determine the makespan almost regardless of how jobs are scheduled on the remaining ones. This causes problems when machines fail and jobs need to be rescheduled. Instead of optimising only the makespan, we put the individual machine spans in non-ascending order and lexicographically minimise the resulting tuples. This achieves that all machines complete as early as possible and increases the robustness of the schedule. We study the application of Answer-Set Programming (ASP) to solve this problem. While ASP eases modelling, the combination of timing constraints and the considered objective function challenges current solving technology. The former issue is addressed by using an extension of ASP by difference logic. For the latter, we devise different algorithms that use multi-shot solving. To tackle industrial-sized instances, we study different approximations and heuristics. Our experimental results show that ASP is indeed a promising KRR paradigm for this problem and is competitive with state-of-the-art CP and MIP solvers. Under consideration in Theory and Practice of Logic Programming (TPLP).

AIMay 27
An Enhanced Large Neighborhood Search Approach for the Capacitated Facility Location Problem with Incompatible Customers

Ida Gjergji, Lucas Kletzander, Nysret Musliu et al.

A new variant of the classic capacitated facility location problem, which considers incompatibilities between customers, has recently been introduced in the literature. This problem captures the situation where given pairs of customers cannot be served by the same facility. Such a feature is crucial for many practical cases of location problems, such as the presence of hazardous or polluting materials and contention between competing costumers. In this paper, we propose a Large Neighborhood Search (LNS) method to solve this problem. Within the framework of LNS, we introduce three different destroy operators, which are combined in a hybrid manner, and we use an exact solver in the repair phase. Different algorithmic components are investigated for the design of LNS. The experimental analysis shows that our new method outperforms existing state-of-the-art metaheuristics, providing new best solutions for all available benchmark instances.

AIMar 23, 2022
Exact methods and lower bounds for the Oven Scheduling Problem

Marie-Louise Lackner, Christoph Mrkvicka, Nysret Musliu et al.

The Oven Scheduling Problem (OSP) is a new parallel batch scheduling problem that arises in the area of electronic component manufacturing. Jobs need to be scheduled to one of several ovens and may be processed simultaneously in one batch if they have compatible requirements. The scheduling of jobs must respect several constraints concerning eligibility and availability of ovens, release dates of jobs, setup times between batches as well as oven capacities. Running the ovens is highly energy-intensive and thus the main objective, besides finishing jobs on time, is to minimize the cumulative batch processing time across all ovens. This objective distinguishes the OSP from other batch processing problems which typically minimize objectives related to makespan, tardiness or lateness. We propose to solve this NP-hard scheduling problem via constraint programming (CP) and integer linear programming (ILP) and present corresponding models. For an experimental evaluation, we introduce a multi-parameter random instance generator to provide a diverse set of problem instances. Using state-of-the-art solvers, we evaluate the quality and compare the performance of our CP- and ILP-models. We show that our models can find feasible solutions for instances of realistic size, many of those being provably optimal or nearly optimal solutions. Finally, we derive theoretical lower bounds on the solution cost of feasible solutions to the OSP; these can be computed within a few seconds. We show that these lower bounds are competitive with those derived by state-of-the-art solvers.

AIFeb 24, 2025
Intermediate Languages Matter: Formal Choice Drives Neurosymbolic LLM Reasoning

Alexander Beiser, David Penz, Nysret Musliu

Large language models (LLMs) achieve astonishing results on a wide range of tasks. However, their formal reasoning ability still lags behind. A promising approach is Neurosymbolic LLM reasoning. It works by using LLMs as translators from natural to formal languages and symbolic solvers for deriving correct results. Still, it remains unclear what the contributing factors to the success of Neurosymbolic LLM reasoning are. This paper shows that one important factor is the choice of the formal language. By comparing 4 formal languages on 3 datasets over 6 LLMs, we show that the choice of formal language affects both the syntactic and the semantic reasoning capability. Thereby, we introduce the intermediate language challenge, which is the challenge of picking a suitable formal language for neurosymbolic reasoning. Further, we compare the effects of using different in-context-learning examples in an ablation study. We conclude that on average, context-aware encodings help LLMs to reason, while there is no apparent effect of using comments or markdown syntax.

AIDec 5, 2025
Solving Parallel Machine Scheduling With Precedences and Cumulative Resource Constraints With Calendars

Christoph Einspieler, Matthias Horn, Marie-Louise Lackner et al.

The task of finding efficient production schedules for parallel machines is a challenge that arises in most industrial manufacturing domains. There is a large potential to minimize production costs through automated scheduling techniques, due to the large-scale requirements of modern factories. In the past, solution approaches have been studied for many machine scheduling variations, where even basic variants have been shown to be NP-hard. However, in today's real-life production environments, additional complex precedence constraints and resource restrictions with calendars arise that must be fulfilled. These additional constraints cannot be tackled efficiently by existing solution techniques. Thus, there is a strong need to develop and analyze automated methods that can solve such real-life parallel machine scheduling scenarios. In this work, we introduce a novel variant of parallel machine scheduling with job precedences and calendar-based cumulative resource constraints that arises in real-life industrial use cases. A constraint modeling approach is proposed as an exact solution method for small scheduling scenarios together with state-of-the-art constraint-solving technology. Further, we propose a construction heuristic as well as a tailored metaheuristic using local search to efficiently tackle large-scale problem instances. This metaheuristic approach has been deployed and is currently being used in an industrial setting.

AISep 4, 2025
Intermediate Languages Matter: Formal Languages and LLMs affect Neurosymbolic Reasoning

Alexander Beiser, David Penz, Nysret Musliu

Large language models (LLMs) achieve astonishing results on a wide range of tasks. However, their formal reasoning ability still lags behind. A promising approach is Neurosymbolic LLM reasoning. It works by using LLMs as translators from natural to formal languages and symbolic solvers for deriving correct results. Still, the contributing factors to the success of Neurosymbolic LLM reasoning remain unclear. This paper demonstrates that one previously overlooked factor is the choice of the formal language. We introduce the intermediate language challenge: selecting a suitable formal language for neurosymbolic reasoning. By comparing four formal languages across three datasets and seven LLMs, we show that the choice of formal language affects both syntactic and semantic reasoning capabilities. We also discuss the varying effects across different LLMs.

AISep 2, 2025
Key Principles in Cross-Domain Hyper-Heuristic Performance

Václav Sobotka, Lucas Kletzander, Nysret Musliu et al.

Cross-domain selection hyper-heuristics aim to distill decades of research on problem-specific heuristic search algorithms into adaptable general-purpose search strategies. In this respect, existing selection hyper-heuristics primarily focus on an adaptive selection of low-level heuristics (LLHs) from a predefined set. In contrast, we concentrate on the composition of this set and its strategic transformations. We systematically analyze transformations based on three key principles: solution acceptance, LLH repetitions, and perturbation intensity, i.e., the proportion of a solution affected by a perturbative LLH. We demonstrate the raw effects of our transformations on a trivial unbiased random selection mechanism. With an appropriately constructed transformation, this trivial method outperforms all available state-of-the-art hyper-heuristics on three challenging real-world domains and finds 11 new best-known solutions. The same method is competitive with the winner of the CHeSC competition, commonly used as the standard cross-domain benchmark. Moreover, we accompany several recent hyper-heuristics with such strategic transformations. Using this approach, we outperform the current state-of-the-art methods on both the CHeSC benchmark and real-world domains while often simplifying their designs.

AIJul 30, 2025
ASP-FZN: A Translation-based Constraint Answer Set Solver

Thomas Eiter, Tobias Geibinger, Tobias Kaminski et al.

We present the solver asp-fzn for Constraint Answer Set Programming (CASP), which extends ASP with linear constraints. Our approach is based on translating CASP programs into the solver-independent FlatZinc language that supports several Constraint Programming and Integer Programming backend solvers. Our solver supports a rich language of linear constraints, including some common global constraints. As for evaluation, we show that asp-fzn is competitive with state-of-the-art ASP solvers on benchmarks taken from past ASP competitions. Furthermore, we evaluate it on several CASP problems from the literature and compare its performance with clingcon, which is a prominent CASP solver that supports most of the asp-fzn language. The performance of asp-fzn is very promising as it is already competitive on plain ASP and even outperforms clingcon on some CASP benchmarks.

OCMay 5, 2025
Integrating Column Generation and Large Neighborhood Search for Bus Driver Scheduling with Complex Break Constraints

Lucas Kletzander, Tommaso Mannelli Mazzoli, Nysret Musliu et al.

The Bus Driver Scheduling Problem (BDSP) is a combinatorial optimization problem with the goal to design shifts to cover prearranged bus tours. The objective takes into account the operational cost as well as the satisfaction of drivers. This problem is heavily constrained due to strict legal rules and collective agreements. The objective of this article is to provide state-of-the-art exact and hybrid solution methods that can provide high-quality solutions for instances of different sizes. This work presents a comprehensive study of both an exact method, Branch and Price (B&P), as well as a Large Neighborhood Search (LNS) framework which uses B&P or Column Generation (CG) for the repair phase to solve the BDSP. It further proposes and evaluates a novel deeper integration of B&P and LNS, storing the generated columns from the LNS subproblems and reusing them for other subproblems, or to find better global solutions. The article presents a detailed analysis of several components of the solution methods and their impact, including general improvements for the B&P subproblem, which is a high-dimensional Resource Constrained Shortest Path Problem (RCSPP), and the components of the LNS. The evaluation shows that our approach provides new state-of-the-art results for instances of all sizes, including exact solutions for small instances, and low gaps to a known lower bound for mid-sized instances. Conclusions: We observe that B&P provides the best results for small instances, while the tight integration of LNS and CG can provide high-quality solutions for larger instances, further improving over LNS which just uses CG as a black box. The proposed methods are general and can also be applied to other rule sets and related optimization problems

AIJun 15, 2020
Exact and Metaheuristic Approaches for the Production Leveling Problem

Johannes Vass, Marie-Louise Lackner, Nysret Musliu

In this paper we introduce a new problem in the field of production planning which we call the Production Leveling Problem. The task is to assign orders to production periods such that the load in each period and on each production resource is balanced, capacity limits are not exceeded and the orders' priorities are taken into account. Production Leveling is an important intermediate step between long-term planning and the final scheduling of orders within a production period, as it is responsible for selecting good subsets of orders to be scheduled within each period. A formal model of the problem is proposed and NP-hardness is shown by reduction from Bin Backing. As an exact method for solving moderately sized instances we introduce a MIP formulation. For solving large problem instances, metaheuristic local search is investigated. A greedy heuristic and two neighborhood structures for local search are proposed, in order to apply them using Variable Neighborhood Descent and Simulated Annealing. Regarding exact techniques, the main question of research is, up to which size instances are solvable within a fixed amount of time. For the metaheuristic approaches the aim is to show that they produce near-optimal solutions for smaller instances, but also scale well to very large instances. A set of realistic problem instances from an industrial partner is contributed to the literature, as well as random instance generators. The experimental evaluation conveys that the proposed MIP model works well for instances with up to 250 orders. Out of the investigated metaheuristic approaches, Simulated Annealing achieves the best results. It is shown to produce solutions with less than 3% average optimality gap on small instances and to scale well up to thousands of orders and dozens of periods and products. The presented metaheuristic methods are already being used in the industry.

AINov 12, 2019
Investigating Constraint Programming and Hybrid Methods for Real World Industrial Test Laboratory Scheduling

Tobias Geibinger, Florian Mischek, Nysret Musliu

In this paper we deal with a complex real world scheduling problem closely related to the well-known Resource-Constrained Project Scheduling Problem (RCPSP). The problem concerns industrial test laboratories in which a large number of tests has to be performed by qualified personnel using specialised equipment, while respecting deadlines and other constraints. We present different constraint programming models and search strategies for this problem. Furthermore, we propose a Very Large Neighborhood Search approach based on our CP methods. Our models are evaluated using CP solvers and a MIP solver both on real-world test laboratory data and on a set of generated instances of different sizes based on the real-world data. Further, we compare the exact approaches with VLNS and a Simulated Annealing heuristic. We could find feasible solutions for all instances and several optimal solutions and we show that using VLNS we can improve upon the results of the other approaches.