Ekaba Bisong

2papers

2 Papers

LGDec 22, 2017
Benchmarking Decoupled Neural Interfaces with Synthetic Gradients

Ekaba Bisong

Artifical Neural Networks are a particular class of learning systems modeled after biological neural functions with an interesting penchant for Hebbian learning, that is "neurons that wire together, fire together". However, unlike their natural counterparts, artificial neural networks have a close and stringent coupling between the modules of neurons in the network. This coupling or locking imposes upon the network a strict and inflexible structure that prevent layers in the network from updating their weights until a full feed-forward and backward pass has occurred. Such a constraint though may have sufficed for a while, is now no longer feasible in the era of very-large-scale machine learning, coupled with the increased desire for parallelization of the learning process across multiple computing infrastructures. To solve this problem, synthetic gradients (SG) with decoupled neural interfaces (DNI) are introduced as a viable alternative to the backpropagation algorithm. This paper performs a speed benchmark to compare the speed and accuracy capabilities of SG-DNI as opposed to a standard neural interface using multilayer perceptron MLP. SG-DNI shows good promise, in that it not only captures the learning problem, it is also over 3-fold faster due to it asynchronous learning capabilities.

SEDec 19, 2017
Built to Last or Built Too Fast? Evaluating Prediction Models for Build Times

Ekaba Bisong, Eric Tran, Olga Baysal

Automated builds are integral to the Continuous Integration (CI) software development practice. In CI, developers are encouraged to integrate early and often. However, long build times can be an issue when integrations are frequent. This research focuses on finding a balance between integrating often and keeping developers productive. We propose and analyze models that can predict the build time of a job. Such models can help developers to better manage their time and tasks. Also, project managers can explore different factors to determine the best setup for a build job that will keep the build wait time to an acceptable level. Software organizations transitioning to CI practices can use the predictive models to anticipate build times before CI is implemented. The research community can modify our predictive models to further understand the factors and relationships affecting build times.