Battery Electric Truck Infrastructure Co-design via Joint Optimization and Agent-based Simulation

Juan Pablo Bertucci, Mauro Salazar, Theo Hofman

As zero-emission zones emerge in European cities, fleet operators are shifting to electric vehicles. To maintain their current operations, a clear understanding of the charging infrastructure required and its relationship to existing power grid limitations is needed. This study presents an optimization frame-work for jointly designing charging infrastructure and schedules within a logistics distribution network, validated through agent-based simulations. We formulate the problem as a mixed-integer linear program and develop an agent-based model to evaluate various designs and operations under stochastic conditions. Our experiments compare rule-based and optimized strategies in a case study of the Netherlands. Results show that current commercial solutions suffice for middle-mile logistics, with central co-design yielding average cost reductions of 5.2% to 6.4% and an average 20.1% decrease in total installed power. While rule-based control effectively manages charging operations and mitigates delays, optimizing charge scheduling significantly reduces queuing times (99%), charging costs (13.5%), and time spent near capacity (10.9%). Our optimization-simulation framework paves the way for combining optimized infrastructure planning and realistic fleet operations in digital-twin environments.

37.9SYMar 31
Simultaneous Optimization of Electric Ferry Operations and Charging Infrastructure

Juan Pablo Bertucci, Theo Hofman, Mauro Salazar

Electrification of marine transport is a promising solution to reduce sector greenhouse gas emissions and operational costs. However, the large upfront cost of electric vessels and the required charging infrastructure can be a barrier to the development of this technology. Optimization algorithms that jointly design the charging infrastructure and the operation of electric vessels can help to reduce these costs and make these projects viable. In this paper, we present a mixed-integer linear programming optimization framework that jointly schedules ferry operations, charging infrastructure and ship battery size. We analyze our algorithms with the case of the China Zorrilla, the largest electric ferry in the world, which will operate between Buenos Aires and Colonia del Sacramento in 2025. We find that the joint system and operations design can reduce the total costs by 7.8\% compared to a scenario with fixed power limits and no port energy management system.