Dam Kim

h-index7
2papers
138citations

2 Papers

7.0SYJul 16
Stochastic Multi-Segment Scheduling of Variable-Speed Pumped Storage Hydropower for Energy and Ancillary Services Provision

Kyung-bin Kwon, SangWoo Park, Dam Kim

Variable-speed pumped storage hydropower (VS-PSH) offers long-duration energy storage alongside ancillary services in competitive electricity markets. However, its operation and scheduling are challenged by head-dependent nonlinearities, discrete mode transitions, and energy-continuity constraints. This study proposes a stochastic framework for VS-PSH that employs a multi-segment bidding structure to generate market-consistent energy and synchronized reserve offers in compliance with market rules. The framework explicitly incorporates physical constraints, including head-dependent capability limits, discrete pumping and generating modes, as well as state-of-charge (SoC) and head dynamics, within a stochastic mixed-integer linear programming (MILP) formulation. Price uncertainty is represented through a scenario-based modeling approach that scales base-case prices and allows variations in (dis)charging incentives. The stochastic MILP produces optimal energy and mode schedules that maintain feasible SoC trajectories across scenarios and ensure physically feasible operating strategies. Case studies under different levels of price variability demonstrate the operational feasibility and market applicability of the proposed framework, showing effective coordination between energy arbitrage and reserve provision under uncertainty. These results highlight the operational and economic value of VS-PSH as a grid-scale energy storage resource.

1.5SYJul 8
Degradation-Aware Pumping Control of Variable-Speed Pumped Storage via Residual Reinforcement Learning

Kyung-bin Kwon, SangWoo Park, Dam Kim

Variable-speed pumped storage hydropower (VS-PSH) must honor short-block dispatch commitments while limiting the operational degradation that intensified regulation duty inflicts on its components. When a single controller pursues both aims at once, every tracking gain is paid for in degradation, a conflict that persists even under full model knowledge and look-ahead. This paper proposes a two-layer control architecture that separates the guaranteed commitment from the bounded learning. A deterministic feedforward-PI gate controller, auditable and certifiable for grid-connected operation, secures average power delivery over each five-minute block, while a residual reinforcement learning policy adjusts only the rotor speed within a fixed bound the gate loop can always absorb, so the worst-case command is bounded by construction. The speed policy tracks a demand-dependent best-efficiency-point reference and is trained against an operation-degradation index that combines off-best-efficiency hydraulic loss with power and actuation variation into one physically interpretable signal. Across normal and stressed dispatch, the proposed policy lowers best-efficiency-point tracking error by roughly 96\% relative to a fixed-speed baseline and cuts total degradation by up to about 56\% under the most demanding dispatch. It matches or slightly exceeds a full-information model-based optimizer in efficiency while preserving substantially tighter block tracking.