8.4DSJun 14
Recoverable robust shortest path problem under interval budgeted uncertainty representationsMarcel Jackiewicz, Adam Kasperski, Pawel Zielinski
In this paper, the recoverable robust shortest path problem under interval uncertainty representations is discussed. This problem is known to be strongly NP-hard and also hard to approximate in general digraphs. In this paper, the class of acyclic digraphs is considered. It is shown that for the traditional interval uncertainty, the problem can be solved in polynomial time for all natural, known from the literature, neighborhoods. Efficient algorithms for various classes of acyclic digraphs are constructed. Some negative results for general digraphs are strengthened. Finally, some exact and approximate methods of solving the problem under budgeted interval uncertainty are proposed.
8.5CCApr 30
Computational Complexity of the Recoverable Robust Shortest Path Problem with Discrete RecourseMarcel Jackiewicz, Adam Kasperski, Paweł Zieliński
In this paper the recoverable robust shortest path problem is investigated. Discrete budgeted interval uncertainty representation is used to model uncertain second-stage arc costs. The known complexity results for this problem are strengthened. It is shown that it is Sigma_3^p-hard for the arc exclusion and the arc symmetric difference neighborhoods. Furthermore, it is also proven that the inner adversarial problem for these neighborhoods is Pi_2^p-hard.
7.2DSJun 15
Single-item lot sizing problem under budgeted lead-time uncertaintyRomain Guillaume, Adam Kasperski, Szymon Wrobel et al.
In this paper, a single-item lot sizing problem with backordering is discussed. The time horizon is divided into planning periods, characterized by fixed and variable production costs, and future delivery periods with specified demands, where inventory holding and backordering costs may occur. For each planning period, a common nominal lead time is given. The true lead times can deviate to some extent from the nominal one, and their exact values are unknown at the planning step. We assume that lead times take only integer values and splitting production orders is not allowed. Furthermore, order crossovers are prohibited; thus, an order placed earlier cannot arrive after one placed later. A budgeted uncertainty set of possible lead-time scenarios is defined, where a budget allows us to control the amount of uncertainty of lead times. It is shown how to construct a family of production plans varying from the most optimistic (a best lead-time scenario occurs) to the most pessimistic (a worst lead-time scenario occurs). In order to compute these plans the R* criterion is applied which generalizes the conservative robust min-max criterion, commonly used in robust optimization. The computational complexity of the problem is investigated. Polynomial, pseudopolynomial time algorithms, and mixed integer programming formulations are proposed to solve the general problem and its special cases. The results of computational tests are provided that demonstrate that using the R* criterion can significantly enlarge the set of candidate production plans.