1.2SPNov 13, 2019
Condition monitoring and early diagnostics methodologies for hydropower plantsAlessandro Betti, Emanuele Crisostomi, Gianluca Paolinelli et al.
Hydropower plants are one of the most convenient option for power generation, as they generate energy exploiting a renewable source, they have relatively low operating and maintenance costs, and they may be used to provide ancillary services, exploiting the large reservoirs of available water. The recent advances in Information and Communication Technologies (ICT) and in machine learning methodologies are seen as fundamental enablers to upgrade and modernize the current operation of most hydropower plants, in terms of condition monitoring, early diagnostics and eventually predictive maintenance. While very few works, or running technologies, have been documented so far for the hydro case, in this paper we propose a novel Key Performance Indicator (KPI) that we have recently developed and tested on operating hydropower plants. In particular, we show that after more than one year of operation it has been able to identify several faults, and to support the operation and maintenance tasks of plant operators. Also, we show that the proposed KPI outperforms conventional multivariable process control charts, like the Hotelling $t_2$ index.
1.8LGOct 22, 2019
A Scalable Predictive Maintenance Model for Detecting Wind Turbine Component Failures Based on SCADA DataLorenzo Gigoni, Alessandro Betti, Mauro Tucci et al.
In this work, a novel predictive maintenance system is presented and applied to the main components of wind turbines. The proposed model is based on machine learning and statistical process control tools applied to SCADA (Supervisory Control And Data Acquisition) data of critical components. The test campaign was divided into two stages: a first two years long offline test, and a second one year long real-time test. The offline test used historical faults from six wind farms located in Italy and Romania, corresponding to a total of 150 wind turbines and an overall installed nominal power of 283 MW. The results demonstrate outstanding capabilities of anomaly prediction up to 2 months before device unscheduled downtime. Furthermore, the real-time 12-months test confirms the ability of the proposed system to detect several anomalies, therefore allowing the operators to identify the root causes, and to schedule maintenance actions before reaching a catastrophic stage.
3.4LGFeb 26, 2019
Day-Ahead Hourly Forecasting of Power Generation from Photovoltaic PlantsLorenzo Gigoni, Alessandro Betti, Emanuele Crisostomi et al.
The ability to accurately forecast power generation from renewable sources is nowadays recognised as a fundamental skill to improve the operation of power systems. Despite the general interest of the power community in this topic, it is not always simple to compare different forecasting methodologies, and infer the impact of single components in providing accurate predictions. In this paper we extensively compare simple forecasting methodologies with more sophisticated ones over 32 photovoltaic plants of different size and technology over a whole year. Also, we try to evaluate the impact of weather conditions and weather forecasts on the prediction of PV power generation.
2.7LGJan 29, 2019
Predictive Maintenance in Photovoltaic Plants with a Big Data ApproachAlessandro Betti, Maria Luisa Lo Trovato, Fabio Salvatore Leonardi et al.
This paper presents a novel and flexible solution for fault prediction based on data collected from SCADA system. Fault prediction is offered at two different levels based on a data-driven approach: (a) generic fault/status prediction and (b) specific fault class prediction, implemented by means of two different machine learning based modules built on an unsupervised clustering algorithm and a Pattern Recognition Neural Network, respectively. Model has been assessed on a park of six photovoltaic (PV) plants up to 10 MW and on more than one hundred inverter modules of three different technology brands. The results indicate that the proposed method is effective in (a) predicting incipient generic faults up to 7 days in advance with sensitivity up to 95% and (b) anticipating damage of specific fault classes with times ranging from few hours up to 7 days. The model is easily deployable for on-line monitoring of anomalies on new PV plants and technologies, requiring only the availability of historical SCADA and fault data, fault taxonomy and inverter electrical datasheet. Keywords: Data Mining, Fault Prediction, Inverter Module, Key Performance Indicator, Lost Production