Guillaume Infantes

AI
h-index2
4papers
14citations
Novelty53%
AI Score34

4 Papers

AIAug 27, 2024
Earth Observation Satellite Scheduling with Graph Neural Networks and Monte Carlo Tree Search

Antoine Jacquet, Guillaume Infantes, Emmanuel Benazera et al.

Earth Observation Satellite Planning (EOSP) is a difficult optimization problem with considerable practical interest. A set of requested observations must be scheduled on an agile Earth observation satellite while respecting constraints on their visibility window, as well as maneuver constraints that impose varying delays between successive observations. In addition, the problem is largely oversubscribed: there are much more candidate observations than can possibly be achieved. Therefore, one must select the set of observations that will be performed while maximizing their cumulative benefit and propose a feasible schedule for these observations. As previous work mostly focused on heuristic and iterative search algorithms, this paper presents a new technique for selecting and scheduling observations based on Graph Neural Networks (GNNs) and Deep Reinforcement Learning (DRL). GNNs are used to extract relevant information from the graphs representing instances of the EOSP, and DRL drives the search for optimal schedules. A post-learning search step based on Monte Carlo Tree Search (MCTS) is added that is able to find even better solutions. Experiments show that it is able to learn on small problem instances and generalize to larger real-world instances, with very competitive performance compared to traditional approaches.

AIMar 4, 2024
Learning to Solve Job Shop Scheduling under Uncertainty

Guillaume Infantes, Stéphanie Roussel, Pierre Pereira et al.

Job-Shop Scheduling Problem (JSSP) is a combinatorial optimization problem where tasks need to be scheduled on machines in order to minimize criteria such as makespan or delay. To address more realistic scenarios, we associate a probability distribution with the duration of each task. Our objective is to generate a robust schedule, i.e. that minimizes the average makespan. This paper introduces a new approach that leverages Deep Reinforcement Learning (DRL) techniques to search for robust solutions, emphasizing JSSPs with uncertain durations. Key contributions of this research include: (1) advancements in DRL applications to JSSPs, enhancing generalization and scalability, (2) a novel method for addressing JSSPs with uncertain durations. The Wheatley approach, which integrates Graph Neural Networks (GNNs) and DRL, is made publicly available for further research and applications.

AINov 17, 2025
Learning to Solve Resource-Constrained Project Scheduling Problems with Duration Uncertainty using Graph Neural Networks

Guillaume Infantes, Stéphanie Roussel, Antoine Jacquet et al.

The Resource-Constrained Project Scheduling Problem (RCPSP) is a classical scheduling problem that has received significant attention due to of its numerous applications in industry. However, in practice, task durations are subject to uncertainty that must be considered in order to propose resilient scheduling. In this paper, we address the RCPSP variant with uncertain tasks duration (modeled using known probabilities) and aim to minimize the overall expected project duration. Our objective is to produce a baseline schedule that can be reused multiple times in an industrial setting regardless of the actual duration scenario. We leverage Graph Neural Networks in conjunction with Deep Reinforcement Learning (DRL) to develop an effective policy for task scheduling. This policy operates similarly to a priority dispatch rule and is paired with a Serial Schedule Generation Scheme to produce a schedule. Our empirical evaluation on standard benchmarks demonstrates the approach's superiority in terms of performance and its ability to generalize. The developed framework, Wheatley, is made publicly available online to facilitate further research and reproducibility.

LGMay 3, 2018
Open Loop Execution of Tree-Search Algorithms, extended version

Erwan Lecarpentier, Guillaume Infantes, Charles Lesire et al.

In the context of tree-search stochastic planning algorithms where a generative model is available, we consider on-line planning algorithms building trees in order to recommend an action. We investigate the question of avoiding re-planning in subsequent decision steps by directly using sub-trees as action recommender. Firstly, we propose a method for open loop control via a new algorithm taking the decision of re-planning or not at each time step based on an analysis of the statistics of the sub-tree. Secondly, we show that the probability of selecting a suboptimal action at any depth of the tree can be upper bounded and converges towards zero. Moreover, this upper bound decays in a logarithmic way between subsequent depths. This leads to a distinction between node-wise optimality and state-wise optimality. Finally, we empirically demonstrate that our method achieves a compromise between loss of performance and computational gain.