Agile Earth observation satellite scheduling over 20 years: formulations, methods and future directions
It provides a comprehensive survey for researchers and practitioners in satellite operations, but is incremental as it reviews existing work rather than presenting new results.
This paper reviews the agile Earth observation satellite scheduling problem (AEOSSP) over the past 20 years, summarizing formulations, solution methods, and future directions to maximize observation profit under operational constraints.
Agile satellites with advanced attitude maneuvering capability are the new generation of Earth observation satellites (EOSs). The continuous improvement in satellite technology and decrease in launch cost have boosted the development of agile EOSs (AEOSs). To efficiently employ the increasing orbiting AEOSs, the AEOS scheduling problem (AEOSSP) aiming to maximize the entire observation profit while satisfying all complex operational constraints, has received much attention over the past 20 years. The objectives of this paper are thus to summarize current research on AEOSSP, identify main accomplishments and highlight potential future research directions. To this end, general definitions of AEOSSP with operational constraints are described initially, followed by its three typical variations including different definitions of observation profit, multi-objective function and autonomous model. A detailed literature review from 1997 up to 2019 is then presented in line with four different solution methods, i.e., exact method, heuristic, metaheuristic and machine learning. Finally, we discuss a number of topics worth pursuing in the future.