Adaptive Control of Resource Flow to Optimize Construction Work and Cash Flow via Online Deep Reinforcement Learning

arXiv:2307.10574v146 citationsh-index: 85
Originality Incremental advance
AI Analysis

This addresses the challenge of time and cost overruns in construction project management, offering an incremental improvement by applying existing DRL techniques to a domain-specific problem.

The paper tackles the problem of optimizing construction project work and cash flows by adaptively controlling resource flows in dynamic, uncertain environments, introducing a deep reinforcement learning method that outperforms empirical and genetic algorithm baselines in simulated scenarios.

Due to complexity and dynamics of construction work, resource, and cash flows, poor management of them usually leads to time and cost overruns, bankruptcy, even project failure. Existing approaches in construction failed to achieve optimal control of resource flow in a dynamic environment with uncertainty. Therefore, this paper introducess a model and method to adaptive control the resource flows to optimize the work and cash flows of construction projects. First, a mathematical model based on a partially observable Markov decision process is established to formulate the complex interactions of construction work, resource, and cash flows as well as uncertainty and variability of diverse influence factors. Meanwhile, to efficiently find the optimal solutions, a deep reinforcement learning (DRL) based method is introduced to realize the continuous adaptive optimal control of labor and material flows, thereby optimizing the work and cash flows. To assist the training process of DRL, a simulator based on discrete event simulation is also developed to mimic the dynamic features and external environments of a project. Experiments in simulated scenarios illustrate that our method outperforms the vanilla empirical method and genetic algorithm, possesses remarkable capability in diverse projects and external environments, and a hybrid agent of DRL and empirical method leads to the best result. This paper contributes to adaptive control and optimization of coupled work, resource, and cash flows, and may serve as a step stone for adopting DRL technology in construction project management.

Foundations

The foundational work for this paper's niche, ranked by how specifically the neighbourhood builds on it — not by global fame.

Your Notes